Flood Control and Drainage20D00068

CONST./ REPAIR/REHAB./IMPVMT. OF VARIOUS INFRASTRUCTURES INCL. LOCAL PROJECTS FLOOD CONTROL AND DRAINAGE FLOOD CONTROL STRUCTURES / FACILITIES CONST. OF REINFORCED CONCRETE (BOX CULVERT DRAINAGE) (PHASE 1), MAYOR JOSE F DIAZ ST. AMPID I, SAN MATEO, RIZAL

CONST./ REPAIR/REHAB./IMPVMT. OF VARIOUS INFRASTRUCTURES INCL. LOCAL PROJECTS FLOOD CONTROL AND DRAINAGE FLOOD CONTROL STRUCTURES / FACILITIES CONST. OF REINFORCED CONCRETE (BOX CULVERT DRAINAGE) (PHASE 1), MAYOR JOSE F DIAZ ST. AMPID I, SAN MATEO, RIZAL is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱97,161,612.48. Status: Past target date (DPWH On-Going). Contractor on record: FLORDES CONST. Figures trace to dpwh.

Region IV-A, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2020 GAA. DBM GAA FY2020

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

333 projects · ₱17.6B total · 0 flags

4. Implementation

Contract Amount

₱97,161,612.48

Progress

Past target date (DPWH On-Going)

Start Date

September 15, 2020

Target End

January 24, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.