CLUSTER 9: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, PORT BARTON-KEMDENG ROAD, 9.1: STA. 0+218-STA. 0+250; 9.2: STA. 0+250-STA. 0+458; 9.3: STA. 0+458-STA. 0+485; 9.4: ST
CLUSTER 9: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, PORT BARTON-KEMDENG ROAD, 9.1: STA. 0+218-STA. 0+250; 9.2: STA. 0+250-STA. 0+458; 9.3: STA. 0+458-STA. 0+485; 9.4: ST is a DPWH-tracked public work in Region IV-B, Region IV-B. Reported contract value: ₱196,953,931.98. Status: Reported complete (DPWH). Contractor on record: HGG BUILDERS. Figures trace to dpwh.
Total Contract Cost