MFO2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OFFLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OFREVETMENT ALONG IMUS RIVER, ANABU 1-E (PHASE II) AND TANZANG LUMAIII, IMUS, CAVITE 3RD LD
MFO2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OFFLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OFREVETMENT ALONG IMUS RIVER, ANABU 1-E (PHASE II) AND TANZANG LUMAIII, IMUS, CAVITE 3RD LD is a DPWH-tracked public work in Cavite 1st DEO, Region IV-A. Reported contract value: ₱39,200,000.00. Status: Reported complete (DPWH). Contractor on record: N B AVILA CONST 13751. Figures trace to dpwh.
Total Contract Cost

