CONSTRUCTION OF MALITUBOG RIVER BANK PROTECTION (DOWNSTREAM OF MALITUBOG BRIDGE, LEFT BANK), STA 0+000 - STA 0+244.56, BARANGAY POBLACION, BANISILAN, NORTH COTABATO
CONSTRUCTION OF MALITUBOG RIVER BANK PROTECTION (DOWNSTREAM OF MALITUBOG BRIDGE, LEFT BANK), STA 0+000 - STA 0+244.56, BARANGAY POBLACION, BANISILAN, NORTH COTABATO is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱67,249,893.48. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: MARCUS CONST. Figures trace to dpwh.
Total Contract Cost