CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DISACAN RIVER (UPSTREAM AND DOWNSTREAM) INCLUDING DREDGING, MANUKAN AND JOSE DALMAN, ZAMBOANGA DEL NORTE 1ST DEO, DOWNSTREAM - 0+000.00 - 0+718.00, UPSTREAM - 0+000.00 - 0+360.00, NET LENGTH: 1,078.00 LN.M.
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DISACAN RIVER (UPSTREAM AND DOWNSTREAM) INCLUDING DREDGING, MANUKAN AND JOSE DALMAN, ZAMBOANGA DEL NORTE 1ST DEO, DOWNSTREAM - 0+000.00 - 0+718.00, UPSTREAM - 0+000.00 - 0+360.00, NET LENGTH: 1,078.00 LN.M. is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱128,282,203.00. Status: Reported complete (DPWH). Contractor on record: MONTAÑO CONST & DEVELOPMENT CORP. Figures trace to dpwh.