FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TINAPIAN RIVER CONTROL, STA. 1+367 - STA. 1+705 (UPSTREAM RIGHT SIDE), STA.1+367 -STA.1+705 (UPSTREAM LEFT SIDE), NET LENGTH = 676.
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TINAPIAN RIVER CONTROL, STA. 1+367 - STA. 1+705 (UPSTREAM RIGHT SIDE), STA.1+367 -STA.1+705 (UPSTREAM LEFT SIDE), NET LENGTH = 676. is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱48,999,938.86. Status: Reported complete (DPWH). Contractor on record: A C RIVERO DEVELOPMENT CORP. Figures trace to dpwh.
Total Contract Cost
