Construction of Flood Control Structure along Sagayaran River (Upstream) of Nabaliwa Bridge with Slope Protection, Pangantucan, Package 1, Bukidnon
Construction of Flood Control Structure along Sagayaran River (Upstream) of Nabaliwa Bridge with Slope Protection, Pangantucan, Package 1, Bukidnon is a DPWH-tracked public work in PANGANTUCAN (BUKIDNON), BUKIDNON, Region X. Reported contract value: ₱28,919,800.00. Status: Reported complete (DPWH). Contractor on record: C'ZARLES CONST & SUPPLY. Figures trace to sumbong.
Total Contract Cost






