FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL SYSTEM, ALONG USAB RIVER, STA. 2+491.00 - STA. 2+565.50 (UPSTREAM RIGHT SIDE), STA. 2+491.00 - STA. 2+565.50 (UPSTREAM,
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL SYSTEM, ALONG USAB RIVER, STA. 2+491.00 - STA. 2+565.50 (UPSTREAM RIGHT SIDE), STA. 2+491.00 - STA. 2+565.50 (UPSTREAM, is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱10,086,080.25. Status: Reported complete (DPWH). Contractor on record: EBARAM GEN CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost