CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEM-DIKING WITH SLOPE PROTECTION & CUT-OFF CHANNELING/DESILTING ALONG MALISIK RIVER, CANDABA, PAMPANGA 4TH L.D., CANDABA, PAMPANGA
CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEM-DIKING WITH SLOPE PROTECTION & CUT-OFF CHANNELING/DESILTING ALONG MALISIK RIVER, CANDABA, PAMPANGA 4TH L.D., CANDABA, PAMPANGA is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱87,615,488.21. Status: Reported complete (DPWH). Contractor on record: EDDMARI CONST. Figures trace to dpwh.
Total Contract Cost

