CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM -REHABILITATION OF FLOOD CONTROL SYSTEM ALONG TALADONG RIVER (LEFT SIDE), TALADONG, CAMALIG, ALBAY
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM -REHABILITATION OF FLOOD CONTROL SYSTEM ALONG TALADONG RIVER (LEFT SIDE), TALADONG, CAMALIG, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱20,568,069.22. Status: Reported complete (DPWH). Contractor on record: WELEX CONST INC FORMERLY WELEX C 9323. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
