CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM REPAIR/ REHAB./IMPV'T OF DIGMALA RIVER CONTROL, STA. 3+729.20-STA. 4+406.70 ARIENDO SECTION,BONGABON.N.E.
CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM REPAIR/REHAB./IMPV'T OF DIGMALA RIVER CONTROL, STA. 3+729.20-STA. 4+406.70 ARIENDO SECTION,BONGABON.N.E. is a DPWH-tracked public work in Nueva Ecija 2nd DEO, Region III. Reported contract value: ₱18,561,393.30. Status: Reported complete (DPWH). Contractor on record: SOLFIO P JACINTO CONST INC. Figures trace to dpwh.
Total Contract Cost

