REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, PONIETE BRIDGE (B00000MN), ALONG SURIGAO-DAVAO COASTAL ROAD, BRGY. PONIENTE, GIGAQUIT, SURIGAO DEL NORTE, K1169+177.00-K1169+200
REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, PONIETE BRIDGE (B00000MN), ALONG SURIGAO-DAVAO COASTAL ROAD, BRGY. PONIENTE, GIGAQUIT, SURIGAO DEL NORTE, K1169+177.00-K1169+200 is a DPWH-tracked public work in Surigao del Norte 2nd DEO, Region XIII. Reported contract value: ₱1,383,813.94. Status: Reported complete (DPWH). Contractor on record: A T DUMLAO CONST INC FORMERLYANDONI T D. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

