CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG IMUS RIVER, PHASE 1, BARANGAY SAMPALOC IV, DASMARIÑAS CITY, CAVITE
CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG IMUS RIVER, PHASE 1, BARANGAY SAMPALOC IV, DASMARIÑAS CITY, CAVITE is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱34,023,599.15. Status: Past target date (DPWH On-Going). Contractor on record: KLDS TRADING. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
