CONST. OF DAVAO RIVER FLOOD CONTROL (F. TORRES BRIDGE SECTION) UPSTREAM, DAVAO CITY
CONST. OF DAVAO RIVER FLOOD CONTROL (F. TORRES BRIDGE SECTION) UPSTREAM, DAVAO CITY is a DPWH-tracked public work in Davao City DEO, Region XI. Reported contract value: ₱38,023,594.03. Status: Reported complete (DPWH). Contractor on record: RELY CONST. Figures trace to dpwh.
Total Contract Cost
