Flood Control and Drainage21AD0047

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM-COMPLETION OF SAN JOSE-SAN ISIDRO-SAN NICOLAS DRAINAGE CANAL, CANDON CITY, ILOCOS SUR

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM-COMPLETION OF SAN JOSE-SAN ISIDRO-SAN NICOLAS DRAINAGE CANAL, CANDON CITY, ILOCOS SUR is a DPWH-tracked public work in Ilocos Sur 2nd DEO, Region I. Reported contract value: ₱29,399,950.90. Status: Reported complete (DPWH). Contractor on record: ARM-ASIA CONST. Figures trace to dpwh.

Ilocos Sur 2nd DEO, Region I
Region: Region I

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱7,700,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Langlangca Bridge 3 (Downstream), Langlangca, Candon City, Ilocos Sur
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Ilocos Sur 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱29,399,950.90

Progress

Reported complete (DPWH)

Start Date

October 22, 2021

Target End

April 29, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.