Construction of Flood Control Structure along San Miguel River, Sta. 12+430 - Sta. 12+630, San Miguel, Bulacan
Construction of Flood Control Structure along San Miguel River, Sta. 12+430 - Sta. 12+630, San Miguel, Bulacan is a DPWH-tracked public work in SAN MIGUEL (BULACAN), BULACAN, Region III. Reported contract value: ₱82,024,947.30. Status: Reported complete (DPWH). Contractor on record: SELPHAR CONST / N B AVILA CONST. Figures trace to sumbong.
Total Contract Cost


