CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, KINABUTAN RIVER CONTROL / SURIGAO CITY, SURIGAO DEL NORTE, STA.0+351.20-STA.0+566.80
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, KINABUTAN RIVER CONTROL / SURIGAO CITY, SURIGAO DEL NORTE, STA.0+351.20-STA.0+566.80 is a DPWH-tracked public work in Surigao del Norte 2nd DEO, Region XIII. Reported contract value: ₱19,555,614.12. Status: Reported complete (DPWH). Contractor on record: CHARLZ CONST INC. Figures trace to dpwh.
Total Contract Cost


