CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANK OF CREEKS ALONG BRGY. 186 (PHASE 2), CALOOCAN CITY
CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANK OF CREEKS ALONG BRGY. 186 (PHASE 2), CALOOCAN CITY is a DPWH-tracked public work in Metro Manila 3rd DEO, National Capital Region. Reported contract value: ₱15,470,668.60. Status: Reported complete (DPWH). Contractor on record: B P DELA TORRE CONST AND DEVELOPMENT CORP. Figures trace to dpwh.
Total Contract Cost
