Flood Control Structure Along Tarlac River Control Right Dike, Colibangbang-Nancamarinan Section, Paniqui, Tarlac
Flood Control Structure Along Tarlac River Control Right Dike, Colibangbang-Nancamarinan Section, Paniqui, Tarlac is a DPWH-tracked public work in PANIQUI (TARLAC), TARLAC, Region III. Reported contract value: ₱33,950,858.49. Status: Reported complete (DPWH). Contractor on record: BIG BERTHA CONST & DEVELOPMENT. Figures trace to sumbong.
Total Contract Cost
