CONSTRUCTION OF FLOOD CONTROL STRUCTURE (GROUTED RIPRAP) AT BINUANGAN BRIDGE K003+927 UPSTREAM (100 LM BOTH SIDES), DOWNSTREAM (100 LM. BOTH SIDES), ISABELA-LAMITAN ROAD SECTION
CONSTRUCTION OF FLOOD CONTROL STRUCTURE (GROUTED RIPRAP) AT BINUANGAN BRIDGE K003+927 UPSTREAM (100 LM BOTH SIDES), DOWNSTREAM (100 LM. BOTH SIDES), ISABELA-LAMITAN ROAD SECTION is a DPWH-tracked public work in Isabela City DEO, Region IX. Reported contract value: ₱33,777,777.00. Status: Reported complete (DPWH). Contractor on record: C B GARAY PHILWIDE BUILDERS. Figures trace to dpwh.
Total Contract Cost