CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG BRGY. BOCBOC EAST, AGUILAR, PANGASINAN
CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG BRGY. BOCBOC EAST, AGUILAR, PANGASINAN is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱19,299,991.67. Status: Reported complete (DPWH). Contractor on record: BET CONST. Figures trace to dpwh.
Total Contract Cost
