FLOOD CONTROL PROJECTS BASED ON FLOOD MASTER PLAN FOR METRO MANILA AND SURROUNDING AREAS CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM AND DOWNSTREAM) OF MAGAMPON BRIDGE, SAN PABLO CITY, LAGUNA 3RD LD
FLOOD CONTROL PROJECTS BASED ON FLOOD MASTER PLAN FOR METRO MANILA AND SURROUNDING AREAS CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM AND DOWNSTREAM) OF MAGAMPON BRIDGE, SAN PABLO CITY, LAGUNA 3RD LD is a DPWH-tracked public work in Laguna 3rd DEO, Region IV-A. Reported contract value: ₱27,341,820.20. Status: Reported complete (DPWH). Contractor on record: STO CRISTO CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
