FY-2018 CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST/IMPROVEMENT/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG SIBAGUAN RIVERSECTION 1 : STA.0+000.00 - STA.0+064.79 TO SECTION 5 : STA.0+000.00 - STA.0+010.00 SAGNAY, CAM SUR
FY-2018 CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST/IMPROVEMENT/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG SIBAGUAN RIVERSECTION 1 : STA.0+000.00 - STA.0+064.79 TO SECTION 5 : STA.0+000.00 - STA.0+010.00 SAGNAY, CAM SUR is a DPWH-tracked public work in Camarines Sur 4th DEO, Region V. Reported contract value: ₱23,091,898.09. Status: Reported complete (DPWH). Contractor on record: M G SALAZAR CONST CORP FOR M G SALAZAR 4072. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost


