CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTURE OF FLOOD CONTROL, LOWER LANDING BRIDGE (DOWNSTREAM), ALONG MAHAYAG-DUMINGAG ROAD, ZAMBOAGA DEL SUR
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTURE OF FLOOD CONTROL, LOWER LANDING BRIDGE (DOWNSTREAM), ALONG MAHAYAG-DUMINGAG ROAD, ZAMBOAGA DEL SUR is a DPWH-tracked public work in Zamboanga del Sur 1st DEO, Region IX. Reported contract value: ₱19,878,132.86. Status: Reported complete (DPWH). Contractor on record: MINDANAO ROCK. Figures trace to dpwh.
Total Contract Cost