CLUSTER 10: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, PALAWAN, 10.1: PORT BARTON-TDC ROAD, STA. 17+477-STA. 17+644; 10.2: PORT BARTON-KEMDENG ROAD, STA. 0+573-STA. 0+633,
CLUSTER 10: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, PALAWAN, 10.1: PORT BARTON-TDC ROAD, STA. 17+477-STA. 17+644; 10.2: PORT BARTON-KEMDENG ROAD, STA. 0+573-STA. 0+633, is a DPWH-tracked public work in Region IV-B, Region IV-B. Reported contract value: ₱103,208,552.43. Status: Reported complete (DPWH). Contractor on record: ROAD EDGE TRADING. Figures trace to dpwh.
Total Contract Cost

