CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONST./ REHAB. OF RIVER CONTROL STRUCTURES ALONG STA. ROSA RIVER AT SITIO IRAQ (LEFT & RIGHT BANK), BRGY. MACABLING, STA. ROSA CITY, LAGUNA 1ST L.D.
CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONST./ REHAB. OF RIVER CONTROL STRUCTURES ALONG STA. ROSA RIVER AT SITIO IRAQ (LEFT & RIGHT BANK), BRGY. MACABLING, STA. ROSA CITY, LAGUNA 1ST L.D. is a DPWH-tracked public work in Laguna 2nd DEO, Region IV-A. Reported contract value: ₱45,522,448.68. Status: Reported complete (DPWH). Contractor on record: JUSTBILT BUILDERS. Figures trace to dpwh.
Total Contract Cost


