Construction of Mapacopaco Flood Control Structure, Sta. 42+555 - Sta. 42+913.6, Posnaan, Aguinaldo, Ifugao
Construction of Mapacopaco Flood Control Structure, Sta. 42+555 - Sta. 42+913.6, Posnaan, Aguinaldo, Ifugao is a DPWH-tracked public work in AGUINALDO (IFUGAO), IFUGAO, Cordillera Administrative Region. Reported contract value: ₱20,914,465.80. Status: Reported complete (DPWH). Contractor on record: DJY CONST / RODEKOM GEN CONST AND ENT. Figures trace to sumbong.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
