CLUSTER I: 1. CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE B), SITIO BAGANG, BRGY. CABACUNGAN, DULAG, LEYTE; 2. CONSTRUCTION (EXTENSION) OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE B), BRGY. FATIMA, DULAG, LEYTE
CLUSTER I: 1. CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE B), SITIO BAGANG, BRGY. CABACUNGAN, DULAG, LEYTE; 2. CONSTRUCTION (EXTENSION) OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE B), BRGY. FATIMA, DULAG, LEYTE is a DPWH-tracked public work in Region VIII, Region VIII. Reported contract value: ₱155,934,542.21. Status: Reported complete (DPWH). Contractor on record: EZJONES CONST INC. Figures trace to dpwh.
Total Contract Cost
