Flood Control and Drainage25CG0012

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE AT MAASIM RIVER (DOWNSTREAM), BARANGAY SANTO CRISTO, CANDABA, PAMPANGA

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE AT MAASIM RIVER (DOWNSTREAM), BARANGAY SANTO CRISTO, CANDABA, PAMPANGA is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱94,490,058.56. Status: Past target date (DPWH On-Going). Contractor on record: STO CRISTO CONST. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Pampanga River, (Downstream-Left Bank), Barangay Consuelo, Macabebe, Pampanga
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Pampanga 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

490 projects · ₱18.9B total · 0 flags

Other projects by this contractor

View all 490 projects →

4. Implementation

Contract Amount

₱94,490,058.56

Progress

Past target date (DPWH On-Going)

Start Date

February 25, 2025

Target End

November 7, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.