CONSTRUCTION OF FLOOD CONTROL AT BALATUKAN RIVER, UPSTREAM LEFT SIDE, BRGY. MAMBAYAAN, BALINGASAG, MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL AT BALATUKAN RIVER, UPSTREAM LEFT SIDE, BRGY. MAMBAYAAN, BALINGASAG, MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 1st DEO, Region X. Reported contract value: ₱13,948,366.95. Status: Reported complete (DPWH). Contractor on record: VEN RAY CONST CORP. Figures trace to dpwh.
Total Contract Cost
