MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG SAMPALOC RIVER,PHASE II, EAST SIDE,BRGY. SAMPALOC I, DASMARINAS, CAVITE AND CONSTRUCTION OF REVETMENT ALONG
MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG SAMPALOC RIVER,PHASE II, EAST SIDE,BRGY. SAMPALOC I, DASMARINAS, CAVITE AND CONSTRUCTION OF REVETMENT ALONG is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱46,709,176.05. Status: Reported complete (DPWH). Contractor on record: HEXAMINDZ CORP FORMERLY:KILUSANG MAGKAIBIG 31666. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
