RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT 1.) SAN EDUARDO BRIDGE (B00525SM); 2.) CAJAGWAYAN BRIDGE II (B00547SM) ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD, EASTERN SAMAR
RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT 1.) SAN EDUARDO BRIDGE (B00525SM); 2.) CAJAGWAYAN BRIDGE II (B00547SM) ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD, EASTERN SAMAR is a DPWH-tracked public work in Eastern Samar DEO, Region VIII. Reported contract value: ₱23,527,329.04. Status: Reported complete (DPWH). Contractor on record: 888 ACY ENT. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
