CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF TABOBO-AN RIVER CONTROL, STA. 00 + 018 - STA. 00 + 376.80 (L/S) (AS PER SURVEY), TABOBO - AN, ODIONGAN, ROMBLON
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF TABOBO-AN RIVER CONTROL, STA. 00 + 018 - STA. 00 + 376.80 (L/S) (AS PER SURVEY), TABOBO - AN, ODIONGAN, ROMBLON is a DPWH-tracked public work in Romblon DEO, Region IV-B. Reported contract value: ₱38,360,096.22. Status: Reported complete (DPWH). Contractor on record: LEGACY CONST CORP FORMERLY: LEGACY CONST. Figures trace to dpwh.
Total Contract Cost