Bridges22CG0082

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION (COMPLETION) OF BRIDGE WITH SLOPE PROTECTION AT MALIWALU, BACOLOR, P

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION (COMPLETION) OF BRIDGE WITH SLOPE PROTECTION AT MALIWALU, BACOLOR, P is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱27,847,529.36. Status: Reported complete (DPWH). Contractor on record: STAR PRIME PROPERTY DEVELOPERS INC 37222. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structure/Slope Protection of Mesalipit Creek, Bacolor, Pampanga
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Pampanga 1st DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 37222

11 projects · ₱134.8M total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF GATIAWIN - LACMIT ROAD, ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2022₱23.2M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM: LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION/ REPLACEMENT OF SAN JOSE MATULID BRIDGE ALONG NGCP, MEXICO, PAMPANGA

Pampanga 1st DEO, Region III

2021₱21.6M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM: LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - REPLACEMENT OF BRIDGE (TEMPORARY TO PERMANENT), SAN MIGUEL, MEXICO, PAMPANGA

Pampanga 1st DEO, Region III

2021₱19.7M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF BRIDGE AT CABETICAN, BACOLOR, PAMPANGA

Pampanga 1st DEO, Region III

2022₱11.1M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM: LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION/ WIDENING OF ROAD INCLUDING SLOPE PROTECTION AT BUENAVISTA - PANDACAQUI ROAD, MEXICO, PAMPANGA

Pampanga 1st DEO, Region III

2021₱9.4M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MAIMPIS - MALPITIC ROAD, CITY OF SAN FERNANDO, PAMPANGA

Pampanga 1st DEO, Region III

2022₱9.3M
Reported complete (DPWH)
View all 11 projects →

4. Implementation

Contract Amount

₱27,847,529.36

Progress

Reported complete (DPWH)

Start Date

March 23, 2022

Target End

August 19, 2022

5. Audit