CONSTRUCTION OF RIVER CONTROL/ WITH IMPOUNDING STRUCTURE ALONG ULIAN RIVER IN LAMBUNAO, ILOILO (PACKAGE 5)
CONSTRUCTION OF RIVER CONTROL/ WITH IMPOUNDING STRUCTURE ALONG ULIAN RIVER IN LAMBUNAO, ILOILO (PACKAGE 5) is a DPWH-tracked public work in Region VI, Region VI. Reported contract value: ₱95,962,748.42. Status: Past target date (DPWH On-Going). Contractor on record: MJ BARCELONA CONST AND SUPPLY. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
