CONSTRUCTION OF RIVER BANK PROTECTION (REVETMENT) ALONG ALIP RIVER (PHASE II), STA. 0+330 - STA. 0+557 (LEFT BANK); STA. 0+413 - STA. 0+513 (RIGHT BANK), DATU PAGLAS, MAGUINDANAO
CONSTRUCTION OF RIVER BANK PROTECTION (REVETMENT) ALONG ALIP RIVER (PHASE II), STA. 0+330 - STA. 0+557 (LEFT BANK); STA. 0+413 - STA. 0+513 (RIGHT BANK), DATU PAGLAS, MAGUINDANAO is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱56,162,829.15. Status: Ongoing (DPWH-reported) (Not Yet Started (DPWH-reported)). Contractor on record: JDRC CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
