CONSTRUCTION OF CONCRETE REVETMENT, DOWNSTREAM OF UPPER SILWAY BRIDGE, SILWAY RIVER, STA 0+000 - STA 0+452, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY, SOUTH COTABATO
CONSTRUCTION OF CONCRETE REVETMENT, DOWNSTREAM OF UPPER SILWAY BRIDGE, SILWAY RIVER, STA 0+000 - STA 0+452, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY, SOUTH COTABATO is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱93,597,252.77. Status: Past target date (DPWH On-Going). Contractor on record: JDRC CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost