CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), HAD. MARIA ELEMENTARY SCHOOL, BRGY. HAD. MARIA, SAN ISIDRO, LEYTE, SANGGABON ELEMENTARY SCHOOL, BRGY. BIASONG, SAN ISIDRO, LEYTE, SAN ISIDRO, LEYTE
CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), HAD. MARIA ELEMENTARY SCHOOL, BRGY. HAD. MARIA, SAN ISIDRO, LEYTE, SANGGABON ELEMENTARY SCHOOL, BRGY. BIASONG, SAN ISIDRO, LEYTE, SAN ISIDRO, LEYTE is a DPWH-tracked public work in Leyte 3rd DEO, Region VIII. Reported contract value: ₱380,018.62. Status: Reported complete (DPWH). Contractor on record: RJIR ENT CORP 34843. Figures trace to dpwh.
Total Contract Cost
