Flood Control and Drainage20PC0020

CONSTRUCTION OF SABANGAN FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, POBLACION, CALANASAN, APAYAO

CONSTRUCTION OF SABANGAN FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, POBLACION, CALANASAN, APAYAO is a DPWH-tracked public work in Apayao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱28,960,165.92. Status: Reported complete (DPWH). Contractor on record: TAGEL CORP 43554. Figures trace to dpwh.

Apayao 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No GAA appropriation line matched for this project at current confidence thresholds.

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

DPWH ID 43554

59 projects · ₱1.9B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING (BENGUET SPORTS COMPLEX AND FACILITIES) AT BARANGAY WANGAL, LA TRINIDAD, BENGUET

Cordillera Administrative Region, Cordillera Administrative Region

2021₱163.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AYAGA-STA. MARCELA-FLORA-LASAM RD - K0679 + 000 - K0680 + 500

Apayao 2nd DEO, Cordillera Administrative Region

2024₱94.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL

Apayao 1st DEO, Cordillera Administrative Region

2024₱93.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF KARAGAWAN RIVER FLOOD CONTROL, STA. 81+404 - STA. 82+456 (L/S), KARAGAWAN, K

Apayao 1st DEO, Cordillera Administrative Region

2024₱93.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS -CLAVERIA-CALANASAN-KABUGAO ROAD- K0662+905 - K0663+000

Apayao 2nd DEO, Cordillera Administrative Region

2023₱93.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD-K0632+007-K0632+194

Apayao 2nd DEO, Cordillera Administrative Region

2022₱91.4M
Reported complete (DPWH)
View all 59 projects →

4. Implementation

Contract Amount

₱28,960,165.92

Progress

Reported complete (DPWH)

Start Date

November 5, 2020

Target End

July 27, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.