Bid-Ceiling Hugging
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 23CC0310 was awarded at 100.00% of its ABC. Across its 48 recorded contracts, TOPNOTCH CATALYST BUILDERS INC was awarded at ≥99.5% of ABC 45 times (93.8%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or rounding during the bidding process.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Revetment along Hagonoy River and its Tributaries at Barangay Santa Elena, Hagonoy, Bulacan23CC0310 | 100% | November 8, 2023 | July 3, 2023 | — | completedsumbong source |
Start: March 14, 2023 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Bulacan 1st District Engineering Office",
"ratio": 1.0000034224647913,
"abcPhp": 57899792.13,
"threshold": 0.995,
"contractId": "23CC0310",
"contractor": "TOPNOTCH CATALYST BUILDERS INC",
"contractCostPhp": 57899990.29
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate