Anomaly / indicator worth examining β€” not an accusation.

Ito ay istatistikong anomalya o indikador na dapat suriin β€” hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Contract Splitting Pattern

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining β€” not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 4 contracts awarded to PANAY EAST COAST CONST & SUPPLY by the same office started within 19 days, each between β‚±42.5M and β‚±50M (just under the β‚±50M threshold), with 3 in the same municipality. It is possible that these are separate flood control projects in different barangays, each requiring its own contract.

Public record entityConstruction of Particion Flood Control Project, Barangay Particion, Guimbal, Iloilo
LocationGUIMBAL (ILOILO), ILOILO, Region VIContract 23GF0088
Amountβ‚±48,485,507.81 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β€” not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Particion Flood Control Project, Barangay Particion, Guimbal, Iloilo23GF0088Flood control100%January 13, 2024March 13, 2024β€”completedsumbong source

Start: April 11, 2023 Β· Source fetched October 21, 2026

Rule Definition

β‰₯3 contracts within 120 days, each 85–100% of β‚±50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Iloilo 1st District Engineering Office",
  "contractId": "23GF0088",
  "contractor": "PANAY EAST COAST CONST & SUPPLY",
  "windowDays": 120,
  "clusterSize": 4,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48485507.81,
  "averageTitleSimilarity": 0.876417175840987
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program