Contract Splitting Pattern
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining β not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 4 contracts awarded to PANAY EAST COAST CONST & SUPPLY by the same office started within 19 days, each between β±42.5M and β±50M (just under the β±50M threshold), with 3 in the same municipality. It is possible that these are separate flood control projects in different barangays, each requiring its own contract.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Particion Flood Control Project, Barangay Particion, Guimbal, Iloilo23GF0088Flood control | 100% | January 13, 2024 | March 13, 2024 | β | completedsumbong source |
Start: April 11, 2023 Β· Source fetched October 21, 2026
Rule Definition
β₯3 contracts within 120 days, each 85β100% of β±50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Iloilo 1st District Engineering Office",
"contractId": "23GF0088",
"contractor": "PANAY EAST COAST CONST & SUPPLY",
"windowDays": 120,
"clusterSize": 4,
"thresholdPhp": 50000000,
"contractCostPhp": 48485507.81,
"averageTitleSimilarity": 0.876417175840987
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program