Contract Splitting Pattern
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining β not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 6 contracts awarded to RAMARPLUS INC FORMERLY RAMAR ENT by the same office started within 0 days, each between β±42.5M and β±50M (just under the β±50M threshold), with 4 in the same municipality. It is possible that these are separate legitimate projects in different locations within the same municipality, each requiring its own contract.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Rehabilitation of Marocmoc Bridge Flood Control Structure (Right Side Facing Upstream and Left Side Facing Downstream of Marocmoc Bridge) in Libon, Albay22FO0057Flood control | 100% | December 31, 2022 | December 16, 2022 | β | completedsumbong source |
Start: March 22, 2022 Β· Source fetched October 21, 2026
Rule Definition
β₯3 contracts within 120 days, each 85β100% of β±50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Albay 3rd District Engineering Office",
"contractId": "22FO0057",
"contractor": "RAMARPLUS INC FORMERLY RAMAR ENT",
"windowDays": 120,
"clusterSize": 6,
"thresholdPhp": 50000000,
"contractCostPhp": 44100000,
"averageTitleSimilarity": 0.7727657825766012