Contract Splitting Pattern
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining β not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 3 contracts awarded to MRB11 CONST CORP FORMERLY:MRB CONS by the same office started within 0 days, each between β±42.5M and β±50M (just under the β±50M threshold), with 3 in the same municipality. It is possible that the project was intentionally divided into phases for technical or budgetary reasons.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Rehabilitation of Flood Mitigation Structure along San Juan River (Phase XX), Quezon City23OG0065Flood control | 100% | November 7, 2023 | November 7, 2023 | β | completedsumbong source |
Start: March 13, 2023 Β· Source fetched October 21, 2026
Rule Definition
β₯3 contracts within 120 days, each 85β100% of β±50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Quezon City 2nd District Engineering Office",
"contractId": "23OG0065",
"contractor": "MRB11 CONST CORP FORMERLY:MRB CONS",
"windowDays": 120,
"clusterSize": 3,
"thresholdPhp": 50000000,
"contractCostPhp": 48963617.7,
"averageTitleSimilarity": 0.9765968428792073
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program
