Contract Splitting Pattern
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining β not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 4 contracts awarded to ASIAN PEARL CONST & DEVT CORP by the same office started within 0 days, each between β±42.5M and β±50M (just under the β±50M threshold), with 3 in the same municipality. It is possible these are separate segments or phases of a larger flood control program, each bid out as a distinct contract.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Mitigation Structure along Vintar River (Bislak River), Brgy. Canaam, Sitio Canadem, Vintar, Ilocos Norte22AA0152Flood control | 100% | October 21, 2022 | October 21, 2022 | β | completedsumbong source |
Start: April 4, 2022 Β· Source fetched October 21, 2026
Rule Definition
β₯3 contracts within 120 days, each 85β100% of β±50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Ilocos Norte 1st District Engineering Office",
"contractId": "22AA0152",
"contractor": "ASIAN PEARL CONST & DEVT CORP",
"windowDays": 120,
"clusterSize": 4,
"thresholdPhp": 50000000,
"contractCostPhp": 48360631.63,
"averageTitleSimilarity": 0.8520646032632334
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program
