Bid-Ceiling Hugging
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 22BB0015 was awarded at 100.00% of its ABC. Across its 24 recorded contracts, TJMT CONST was awarded at ≥99.5% of ABC 23 times (95.8%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or competitive bidding that exactly matches the ABC.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Cagayan River, Centro Norte Section 1, Gattaran, Cagayan22BB0015Flood control | 100% | December 21, 2022 | June 11, 2023 | — | completedsumbong source |
Start: February 2, 2022 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Cagayan 1st District Engineering Office",
"ratio": 0.9999964595918368,
"abcPhp": 24500000,
"threshold": 0.995,
"contractId": "22BB0015",
"contractor": "TJMT CONST",
"contractCostPhp": 24499913.26
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate