Contract Splitting Pattern
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 12 contracts awarded to W J P CONST AND SUPPLY by the same office started within 79 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 10 in the same municipality. It is possible these are separate flood control projects for different rivers or barangays within the same municipality, planned together for efficiency.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Tagamusing and Allied River, Barangay Moreno-Sta. Maria, Binalonan, Pangasinan (Package B)24AI0031 | 100% | September 1, 2024 | March 18, 2024 | — | completedsumbong source |
Start: February 14, 2024 · Source fetched October 21, 2026
Rule Definition
≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold in one municipality
{
"deo": "Pangasinan 3rd District Engineering Office",
"contractId": "24AI0031",
"contractor": "W J P CONST AND SUPPLY",
"windowDays": 120,
"clusterSize": 12,
"thresholdPhp": 50000000,
"contractCostPhp": 48922351.16,
"maxInOneMunicipality": 10
}Source documents
Possible Innocent Explanations
Data not yet available (source: rule metadata)