Anomaly / indicator worth examining — not an accusation.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Bid-Ceiling Hugging

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22GO0129 was awarded at 100.00% of its ABC. Across its 16 recorded contracts, A C RIVERO DEVELOPMENT CORP was awarded at ≥99.5% of ABC 16 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible that the bid was calculated to exactly match the ABC, which is allowed but rare.

Public record entityConstruction of Revetment with Floodwall including Improvement of Riverbank (w/ Esplanade) along Sum-ag River, Phase 2, Bacolod City
LocationBACOLOD CITY (CAPITAL) (NEGROS OCCIDENTAL), NEGROS OCCIDENTAL, Region VIContract 22GO0129
Amount₱49,000,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Revetment with Floodwall including Improvement of Riverbank (w/ Esplanade) along Sum-ag River, Phase 2, Bacolod City22GO0129100%January 18, 2023February 26, 2023—completedsumbong source

Start: March 25, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Bacolod City District Engineering Office",
  "ratio": 1,
  "abcPhp": 49000000,
  "threshold": 0.995,
  "contractId": "22GO0129",
  "contractor": "A C RIVERO DEVELOPMENT CORP",
  "contractCostPhp": 49000000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate