EASTERN LINE DEVELOPMENT is listed as a company organization in Philippine public procurement records on this site, with 7 linked DPWH project(s) totaling about ₱94,971,425.41. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
EASTERN LINE DEVELOPMENT
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 7
- Total value
- ₱94,971,425.41
- Published flags
- 0
- Region
- Ilocos Sur 2nd DEO · Region I
Public Record Grade
A transparent, data-derived summary of reported public records for EASTERN LINE DEVELOPMENT — not an accusation or finding of wrongdoing.
Score: 74.60 / 100 · Projects in sample: 7 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 64.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 64.3
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 2
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 7
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 7
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 7
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 7
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 7
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
7 geotagged projects — Open full map
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES, POBLACION SUR-SORIOAN-LUCBUBAN-UBBOG-BAYBAYADING ROAD CONNECTING CANDON-SALCEDO-SAN EMILIO DEL PILAR NATIONAL ROAD IN SUPPORT OF THE CACAO PROCESSING CENTER AND CACA19A00047 · ₱19,300,000.00 · mapped
- CONSTRUCTION/MIANTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF POBLACION SUR FLOOD CONTROL, DEL PILAR, ILOCOS SUR19AD0003 · ₱18,754,512.76 · mapped
- CONSTRUCTION/MIANTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF POBLACION SUR FLOOD CONTROL, SALCEDO, ILOCOS SUR19AD0055 · ₱18,750,829.22 · mapped
- CONSTRUCTION/MIANTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF ATABAY FLOOD CONTROL, SALCEDO, ILOCOS SUR19AD0001 · ₱14,077,143.37 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BALIDBID FLOOD CONTROL, SALCEDO, ILOCOS SUR19AD0056 · ₱14,077,143.37 · mapped
- ASSET PRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS ALONG JCT. CERVANTES-QUIRINO ROAD, K0384+(-500)-K0385+00019AD0030 · ₱5,366,874.03 · mapped
- REHABILITATION OF SLOPE PROTECTION ALONG CERVANTES-MANKAYAN-ABATAN ROAD, K00385+900-K0386+10018AD0145 · ₱4,644,922.66 · mapped
