MASH BUILDER'S AND CONST is listed as a company organization in Philippine public procurement records on this site, with 12 linked DPWH project(s) totaling about ₱47,086,403.51. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
MASH BUILDER'S AND CONST
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 12
- Total value
- ₱47,086,403.51
- Published flags
- 0
- Region
- Cotabato City DEO · Region XII
Public Record Grade
A transparent, data-derived summary of reported public records for MASH BUILDER'S AND CONST — not an accusation or finding of wrongdoing.
Score: 78.20 / 100 · Projects in sample: 12 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 72.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 72.7
- lateCompletedProjects
- 6
- onTimeCompletedProjects
- 5
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 11
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 12
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 12
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 12
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 12
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
11 geotagged projects — Open full map
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PUBLIC MARKET), GENERAL S.K. PENDATUN, MAGUINDANAO23M00146 · ₱8,875,519.18 · mapped
- CONCRETING OF ACCESS ROAD FROM JUNCTION OF KALANGANAN MOTHER TO WEST CIRCUMFERENTIAL, COTABATO CITY20MA0101 · ₱4,934,373.15 · mapped
- CONSTRUCTION OF ROAD, BRGY. RH VII, COTABATO CITY19MA0039 · ₱4,918,315.67 · mapped
- CONSTRUCTION OF EVACUATION CENTER IN THE PROVINCE OF MAGUINDANAO20MA0078 · ₱4,702,448.30 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAGUDTUNGAN, PARANG, MAGUINDANAO23M00113 · ₱4,699,983.94 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY TAGUDTONGAN, PARANG, MAGUINDANAO23M00145 · ₱4,599,951.90 · mapped
- CONSTRUCTION OF DRAINAGE CANAL AT BRGY. RH VII, COTABATO CITY19MA0038 · ₱4,575,224.46 · mapped
- CONCRETING OF ROAD FROM JUNCTION OF KALANGANAN MOTHER TO THE WEST CIRCUMFERENTIAL, STA. 0+000.00 - STA 0+230.5, KALANGANAN MOTHER, COTABATO CITY, MAGUINDANAO21M00122 · ₱3,868,174.36 · mapped
- CONSTRUCTION OF 1 STOREY 2 CLASSROOM SCHOOL BUILDING IN CCNHS-ANNEX (DIOCOLANO SITE), COTABATO CITY17MA0019 · ₱2,556,786.01
- ROAD CONCRETING OF BRGY. ROSARY HEIGHTS III, COTABATO CITY18MA0034 · ₱1,450,343.13 · mapped
- ROAD CONCRETING OF BRGY. ROSARY HEIGHTS IV, COTABATO CITY18MA0035 · ₱962,370.09 · mapped
- CONSTRUCTION (COMPLETION) OF WATER SYSTEM LEVEL III,BRGY. KALANGANAN I, COTABATO CITY18MA0044 · ₱942,913.32 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
