S S R CONST is listed as a company organization in Philippine public procurement records on this site, with 15 linked DPWH project(s) totaling about ₱100,097,317.02. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
S S R CONST
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 15
- Total value
- ₱100,097,317.02
- Published flags
- 0
- Region
- Nueva Ecija 2nd DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for S S R CONST — not an accusation or finding of wrongdoing.
Score: 84.80 / 100 · Projects in sample: 15 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 100/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 100
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 14
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 14
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 80/100 · Weight: 24%
- totalProjects
- 15
- componentScore
- 80
- terminatedProjects
- 1
- terminationRatePct
- 6.7
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 14
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 15
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 15
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
15 geotagged projects — Open full map
- ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BANGAD - FORT MAGSAYSAY RD - K0123+111 - K0124+00024CF0015 · ₱13,803,067.64 · mapped
- CONSTRUCTION OF TRAINING BARRACKS, HAAR-PHILIPPINE ARMY, FORT MAGSAYSAY, NUEVA ECIJA22CF0084 · ₱13,692,110.27 · mapped
- CONSTRUCTION OF OFFICERS QUARTERS AND ENLISTED PERSONNEL BARRACKS, BONGABON, NUEVA ECIJA22CF0041 · ₱9,800,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. KALIKID SUR, CABANATUAN, NUEVA ECIJA23CF0110 · ₱9,800,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. MACATBONG, CABANATUAN, NUEVA ECIJA23CF0111 · ₱9,775,506.51 · mapped
- CONSTRUCTION OF 7ID GRANDSTAND, FORT MAGSAYSAY PALAYAN CITY, NUEVA ECIJA22CF0099 · ₱9,590,579.21 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG NUEVA ECIJA - AURORA RD (S06083LZ) - K0129+982 - K0130+987, CAIMITO, PALAYAN CITY24CF0125 · ₱9,123,800.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III) CONSTRUCTION OF WATER SYSTEM, PALAYAN CITY, NUEVA ECIJA23CF0118 · ₱4,950,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY BANTUG BULALO, CABANATUAN CITY, NUEVA ECIJA25CF0104 · ₱4,875,529.86 · mapped
- CONCRETING OF ROAD BRGY. BECURAN, STA. RITA, PAMPANGA18CH0075 · ₱4,645,196.44 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, (SENIOR CITIZEN BUILDING) AT BRGY. CAALIBANGBANGAN, CABANATUAN CITY, NUEVA ECIJA19CF0116 · ₱3,395,580.86 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTORS IN PUBLIC FACILITIES24CF0114 · ₱2,865,989.54 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT POBLACION, QUEZON, NUEVA ECIJA19CE0143 · ₱1,900,782.21 · mapped
- LOCAL INFRASTRUCTURE PROGRAM: BUILDING AND OTHER STRUCTURES: MULTIPURPOSE/ FACILITIES - REHABILITATION OF MULTI-PURPOSE BUILDING AT MANGGA CACUTUD, ARAYAT, PAMPANGA21CG0140 · ₱1,879,174.48 · mapped
- CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN PALAYAN CITY NATIONAL HIGH SCHOOL LANGKA ANNEX, BARANGAY LANGKA, PALAYAN CITY, NUEVA ECIJA24CF0104 · ₱0.00 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
